projeurope

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
projeurope [2016/06/21 12:16] – Changes to up to 2016 slukaprojeurope [2024/03/18 22:39] (current) beni
Line 98: Line 98:
   * Length: 7268 m (February 2010)   * Length: 7268 m (February 2010)
   * Depth: 259 m (February 2010)   * Depth: 259 m (February 2010)
-  * Links to project page / maps: [[http://klisura.speleo.sk/|map and 3D of cave]]+  * Links to project page / maps: Doesn't work now. [[http://klisura.sss.sk/|map and 3D of cave]]
 .. ..
  
 ===== Germany / Austria ===== ===== Germany / Austria =====
 +==== Hirlatz cave (Austria Dachstein/Hallstatt) ====
 +  * Author: B. Hallinger, M. Schütze, A. Hack
 +  * Length: 117 km (currently[3/2024] about 100 km mapped in therion)
 +  * Height data: LIDAR data Austria
 +  * Overlay graphic: various official austria ortophoto, geoland.at
 +  * Beginning: 2013, ongoing
 +  * Collaborated in a shared SVN repository
 +  
 +
 ==== Cave register of Untersberg (Germany / Austria) ==== ==== Cave register of Untersberg (Germany / Austria) ====
  
  • projeurope.1466504218.txt.gz
  • Last modified: 8 years ago
  • by sluka